Design-Build

Along with VDOT, Shirley has been at the forefront of Design-Build as an alternate method of project delivery for transportation infrastructure in Virginia. With the award of the Route 28 Corridor Improvements PPTA Project in 2002, Shirley began developing our capabilities to
provide a turn-key strategy that performs all project elements. Building on our construction expertise, Shirley has the in-house Teams that integrate each discipline into a comprehensive approach that includes design and engineering, permitting, right-of-way acquisition, utility relocations, and quality assurance and control. We encourage innovation and creativity, and constantly strive for ideas and solutions that minimize risk, reduce project cost, shorten the project schedule, and lighten the owner’s resource requirements, all with a partnering approach. In the 20-plus years since Shirley entered the design-build market, we have become one of the
most successful design-builders in Virginia, Maryland, and the Mid-Atlantic region having won over 50 design-build projects valued at more than $1.5 billion. Notable projects, both large and small, include:

  • Route 28 Corridor Improvements, Fairfax and Loudoun County, VA
  • InterCounty Connector (ICC) Contracts C, D & E, Montgomery and Prince George’s County, MD
  • I-95/Route 630 Interchange, Spotsylvania County, VA
  • Battlefield Parkway Extension, Leesburg, VA
  • Dulles Greenway Widening, Loudoun County, VA
  • Route 7 Corridor Improvements, Fairfax County, VA
  • Route 27/244 Interchange, Arlington County, VA –
  • Route 50 Widening, Fairfax and Loudoun County, VA
  • Route 606 Widening, Loudoun County, VA
  • Route 659 Belmont Ridge Road Widening, Loudoun County, VA
  • I-64 Capacity Improvements, Segments 1 & 3, Hampton Roads, VA
  • Route 7/Rivercreek Parkway Interchange, Leesburg, VA
  • Dulles Metrorail Silverline Phase II, Fairfax and Loudoun County, VA
  • Northstar Boulvard, Loudoun County, VA
  • University Boulevard Extension, Prince William County, VA